Item Client City Country Scope of work  Start Contract  End Contract Percent ofcompletion
1 (TUSROC)Tehran Urban SuburbanRailway Operation Company Tehran Iran Operation and  maintenance of 50 KmOCS(25 Kv)  and 120 Km 3rd Rail of Line 1,2,5 2014 2015 In Progress
2 (MURCO)Mashhad Urban Railway Corporation Mashhad Iran ENGINERING , PROCUREMENT and Instalation Supervision OF 4 TPS , extension to the Airport 2014 2015 In Progress
3 (MURCO)Mashhad Urban Railway Corporation Mashhad Iran Operation and  maintenance of60 TPS and LPS of line 1 Mashad  metro 2013 2016 In Progress
4 (MURCO)Mashhad Urban Railway Corporation Mashhad Iran Design, manufacturig, procurement , installation, test and commissioning of 5 HSCB Trolleys for 750 VDC OCS Feeder 2012 2013 100%
5 (TUSRC)Tehran Urban SuburbanRailway Operation Company Tehran Iran Design, manufacturig, procurement of equipments, installation, test and commissioning of TPS&LPS of A1-7 (کهریزک), Southern Ext. Line 1 2012 2014 65%(In Progress)
6 (TUSROC)Tehran Urban SuburbanRailway Operation Company Tehran Iran Operation and  maintenance of 50 KmOCS(25 Kv)  and 120 Km 3rd Rail of Line 1,2,5 2010 2011 100%
7 (TUSROC)Tehran Urban SuburbanRailway Operation Company Tehran Iran Operation and  maintenance of160 TPS and LPS of line 1و2و3و4 Tehran metro 2009 2015 In Progress
8 (TUSRC)Tehran Urban SuburbanRailway Company Tehran Iran Design, manufacturig, procurement of equipments, installation, test and commissioning of TPS&LPS of Y2 (شهید باقری), Eastern Ext. Line2 2008 2009 100%(In Operation)
9 (TUSRC)Tehran Urban SuburbanRailway Company Tehran Iran Design, manufacturig, procurement of equipments,  installation, test and commissioning of TPS&LPS of Z2(تهران پارس), Eastern Ext. Line2 2008 2009 100%(In Operation)
10 (TUSRC)Tehran Urban SuburbanRailway Company Tehran Iran Design, manufacturig, installation, test and commissioning of TPS&LPS of Z2-1(فرهنگسرا), Eastern Ext. Line2 2008 2009 100%(In Operation)
11 (TUSRC)Tehran Urban SuburbanRailway Company Tehran Iran Design, installation, test and commissioning of 8Km, 3rd rail 750VDC 2008 2009 100%(In Operation)
12 (TTB)Tehran Trolley BusTehran Municipality Tehran Iran Design, manufacturing, procurement of equipments, installation, test and commissioning of TPS, No.8, 825VDC 2008 2009 100%
13 (TTB)Tehran Trolley BusTehran Municipality Tehran Iran Design, manufacturing, procurement of equipments, installation, test and commissioning of TPS, No.9, 825VDC 2008 2009 100%
14 (MURCO)Mashhad Urban Railway Corporation Mashhad Iran Manufacturing and procurement of equipments  of 20kv LPS cubicles for 28 SS 2003 2004 100%(In Operation)
CUSTOMER  COUNTRY PROJECT NAME      END USER     COUNTRY MAIN BUSBAR CURRENT (Amp) SHORT CIRCUIT KA/S CB TYPE PROTECTION RELAY TYPE No. OF PANELS CONFIG. STATUS
N.I.C.I.Co   IRAN Sarcheshmeh extention IRAN 4000 31.5 / 1 HPA ABB 52 NT36 Delivered 2002
N.I.C.I.Co   IRAN Songun Switchgear IRAN 4000 31.5 / 1 HPA ABB 48 NT36 Delivered 2004
N.I.C.I.Co   IRAN Miduk Switchgear IRAN 1250 31.5 / 1 HPA ABB 18 NT36 Delivered 2002
IRITEC        IRAN Songun Condensation IRAN 1250 31.5 / 1 HD4 ABB 13 NTSAFE36 On Going
KWPA        IRAN 5 Substations  Khoozestan IRAN 1250 25/3 HD4 SIEMENS 80 NTSAFE36 Delivered 2004
KWPA        IRAN 2 Substations  Khoozestan IRAN 1250 25/3 HD4 ALSTOM 30 NTSAFE36 On Going
KWPA        IRAN 4 Substations  Khoozestan IRAN 1250 25/3 HD4 ABB 60 NTSAFE36 On Going
MOHAM SHARGH IRAN 2 Substations Khoozestan IRAN 2000 25/3 HD4 ABB 30 NTSAFE36 On Going
SAFA NICOU IRAN Loule Sazi Ahwaz IRAN 1250 25/3 HD4 ALSTOM 18 NTSAFE36 On Going
SAFA NIROU  IRAN I.N.S.I.G IRAN 630 31.5 / 1 HD4 4 NTSAFE36 Delivered 2004
TPP            IRAN Sarcheshmeh Divert Dam & Raw Water Treatment Plant IRAN 1250 25/3 HD4 ABB 9 NTSAFE36 On Going
SAFA NICOU IRAN KWPA 10 Substation IRAN 1250 25/3 HD4 SIEMENS 230 NTSAFE36 Delivered 2005
PARSIAN      IRAN KWPA  5 Substation IRAN 2000 25/3 HD4 ABB 70 NTSAFE36 Delivered 2005